Labatt Breweries- Can Line Expansion

Creston, B.C.

Construction management project with Rendek completing all concrete work with own forces. Project mandate called for a stand-alone addition of 40,000 sq. ft. with double 8″ thick, 40 ft. high masonry fire separation walls, structural steel roof and metal clad exterior.

Unique to this project was the construction of a 48 pile raft concrete slab to support two new silos. The project was completed accident- and fatality-free, with crews ranging in size from 15 men to well over 150 men at the peak of construction. The project was completed on time and the owner was able to manufacture product one month ahead of schedule.